STEPS TO GO SOLAR

Simple six step process in going solar

Ground-Mount-1024x765_edited.jpg
operate.png

Permission to Operate

1-2 Weeks

Inspections and approval from the electric company are the next step.  It generally takes 1-2 weeks for the approvals to be issued.

switch.png

Flip the Switch

1Day

We visit with you again and walk you through your solar energy production system and you get to flip the switch to go solar.

Installation

Our professional installation team  can install most systems in 1-2 days

tools.png

System Design

One of our certified designers will visit your home to take exact measurements and design your own custom SunPower solar energy system.

design.png

Home Meeting

1 Week We meet with you at your home to discuss the solar options that best fit your needs.

house.png

Online Qualification

1 Day Not everyone is qualified to go solar.  We listen to your needs and learn about you, your home, and your electric bill to discover if  solar power is right for you.

phone.png
Fill out the form below to talk with a solar consultant about solar panels for your home.